Hatchlands Road, Redhill

Construction of a large retaining wall using 2 methods of waterproofing. Installation of ground beams & drainage to form multi-level block of flats.

Duration: 38 Weeks
Main Client: Marpaul

Eurotunnel UK, Folkestone

Groundworks to new steel frame building and switchyard. New steel frame including lighting and air-conditioning, decoration, internal walls and doors.

Duration: 30 Weeks
Main Client: GE Capital / STATCOM UK

Starbucks, Belvedere

Reduced level dig, foundations, drainage and external works to form new drive-thru restaurant.

Duration: 14 Weeks
Main Client: RG Group

Holiday Extras, Hythe

Extension to an existing office including surface water drainage adaptions in accordance with Southern Water.

Duration: 60 Weeks
Main Client: Jenner Contractors

Royal Wells Park

External works package to new town houses in Tunbridge Wells .

Duration: 16 Weeks
Main Client: Berkeley Homes

Royal Holloway, Egham

Full works package to form 19 blocks of student accommodation including the installation of foundations, drainage, services, external works, 10 soakaway tank installations, beam & block flooring & gas membrane.

Duration: 80 Weeks
Main Client: Willmott Dixon

Victory Pier, Phase 1

New build blocks of residential units. Paving works on pedestal to upper podium slab. External Works to existing pier arm..

Duration: 12 Weeks
Main Client: Berkeley Homes

Haywards Heath Rail Station

Foundations, surface water drainage, gabion walls and tarmac works.

Duration: 42 Weeks
Main Client: Bourne Parking

Area 15 Kings Hill

Groundworks to carry out the substructures, drainage, road construction, services and hard pavings to construct 73 houses and flats..

Duration: 60 Weeks
Main Client: Jenner Contractors

Amberstone Road, Hailsham

Groundworks to carry out the substructures, drainage, road construction, services and hard pavings to construct 160 houses and flats.

Duration: 100 Weeks
Main Client: Jenner Contractors

Hedge Place Rd, Greenhithe

Reduced level dig, foundations, block and beam, drainage and external works package

Duration: 50 Weeks
Main Client: Durkan Limited

University of Sussex, Brighton

External works package to existing University of Sussex in Brighton.

Duration: 8 Weeks
Main Client: Willmott Dixon Interiors

Averly Football Club

Cut and Fill excercise to form new football pitches, foundations for new club house, external works.

Duration: 30 Weeks
Main Client:CBES Limited

The Grange Care Home

New care home groundworks package including waterproof concrete basement installation, large scale underpinning excercise to retain existing facade, large external works, drainage scheme and S278 road works.

Duration: 60 Weeks
Main Client: Metnor Construction

County Oak Retail Park

External Works Package to existing Retail Park in Crawley, including internal foundations & drainage to existing retail unit.

Duration: 12 Weeks
Main Client: RG Group

Buckland Hospital, Dover

Foundations, drainage, off-site foul, surface connections, reinforced in-situ concrete frame, external works.

Duration: 70 Weeks
Main Client: Interserve

Area 10 & 11 Kings Hill

Groundworks to carry out the substructures, drainage, road construction, services and hard pavings to construct 93 houses and flats..

Duration: 60 Weeks
Main Client: Jenner Contractors

Olympic Park, Stratford

Infrastructure works to exsisting Olympic Park site to form two new neighbourhoods of over 1000 new homes including deep drainage and civils package.

Duration: 80 Weeks
Main Client: Balfour Beatty

Ramsgate Fire station

Foundations, Drainage, Ground Floor Slabs & External Works package to form new fire station.

Duration: 35 Weeks
Main Client: Morgan Sindall

Flambard Way, Goldalming

Externals Works package including soft and hard landscaping.

Duration: 22 Weeks
Main Client: Willmott Dixon

Aberfeldy Village, Phase 2

External works and hard landscaping package to new residential development.

Duration: 52 Weeks
Main Client: Willmott Dixon

Lynwood Care Home, Ascot

New build residential care site, large reinforced concrete basement, large drainage and external works over 2 phases.


Duration: 160 Weeks
Main Client: Willmott Partnership Homes

Hempstead Valley Retail Park

Piling attendance, foundations, ground floor concrete slabs, drainage and external works.


Duration: 40 Weeks
Main Client: Midas Retail

Tesco Store, Woolwich

Groundworks package including drainage to new supermarket and upper level residential facilities.

Duration: 60 Weeks
Main Client: Willmott Dixon